Posts tagged SBIR Phase 2
Continuous Solutions grows its high-power energy capabilities

The lab added a second machine testbed with 132kW 4-quadrant dynamometer - including an acoustically isolated dyno that upgrades the lab to the Department of Defense’ Technical Readiness Level 7. CS now demonstrates system prototypes in an operational environment.

Read More